US Bridges

Por Twp RD 135 over Rb Worden Ditch

Good

Hancock County, Ohio · 0.70 MI N SR 613 · Structure no. 3232891

Built
1992
33 years old
Condition
Good
inspected March 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
25 ft
1 main span
Daily traffic
79
2017 count
Owner
County
County Highway Agency

About this bridge

Por Twp RD 135 over Rb Worden Ditch is a prestressed concrete box beam or girders - multiple carrying Por Twp RD 135 over Rb Worden Ditch in Hancock County, Ohio. It was built in 1992, so it is 33 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 79 vehicles a day, roughly 6% of them trucks, projected to reach 110 by 2037. The structure is 25 ft (7.6 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesPor Twp RD 135
CrossesRb Worden Ditch
Location0.70 MI N SR 613
RouteCounty Highway T0135
StateOhio
Coordinates41.12167, -83.74611
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.7 US tons
Inventory rating42.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length25 ft (7.6 m)
Longest span23 ft (7 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic79 (2017)
Projected traffic110 by 2037
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Por Twp RD 135 over Rb Worden Ditch built?

It was built in 1992, making it 33 years old in 2025.

What condition is Por Twp RD 135 over Rb Worden Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Por Twp RD 135 over Rb Worden Ditch carry?

About 79 vehicles per day (2017 count), of which roughly 6% are trucks.

How long is Por Twp RD 135 over Rb Worden Ditch?

The structure is 25 ft (7.6 m) long with a longest span of 23 ft (7 m) and a deck 24 ft wide.

Who owns Por Twp RD 135 over Rb Worden Ditch?

It is owned by the County Highway Agency.