Por Twp RD 112 over Rb Worden Ditch
GoodHancock County, Ohio · .87 MI E TR 135 · Structure no. 3232574
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected March 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 40 ft
- 1 main span
- Daily traffic
- 20
- 2016 count
- Owner
- County
- County Highway Agency
About this bridge
Por Twp RD 112 over Rb Worden Ditch is a prestressed concrete box beam or girders - multiple carrying Por Twp RD 112 over Rb Worden Ditch in Hancock County, Ohio. It was built in 2016, so it is 9 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 20 vehicles a day, roughly 25% of them trucks, projected to reach 28 by 2036. The structure is 40 ft (12.2 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Por Twp RD 112 over Rb Worden Ditch built?
It was built in 2016, making it 9 years old in 2025.
What condition is Por Twp RD 112 over Rb Worden Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does Por Twp RD 112 over Rb Worden Ditch carry?
About 20 vehicles per day (2016 count), of which roughly 25% are trucks.
How long is Por Twp RD 112 over Rb Worden Ditch?
The structure is 40 ft (12.2 m) long with a longest span of 36 ft (11 m) and a deck 28 ft wide.
Who owns Por Twp RD 112 over Rb Worden Ditch?
It is owned by the County Highway Agency.