Ramp WBIR74-EBI275 over Taylor CR;C457(HARSN Rd)
GoodHamilton County, Ohio · .2 MI E of Ir 74 · Structure no. 3116387
- Built
- 1977
- 48 years old
- Condition
- Good
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 449 ft
- 5 main spans
- Daily traffic
- 13,110
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
Ramp WBIR74-EBI275 over Taylor CR;C457(HARSN Rd) is a steel continuous stringer/multi-beam or girder carrying Ramp WBIR74-EBI275 over Taylor CR;C457(HARSN Rd) in Hamilton County, Ohio. It was built in 1977, so it is 48 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 13,110 vehicles a day, projected to reach 139 by 2033. The structure is 449 ft (136.9 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ramp WBIR74-EBI275 over Taylor CR;C457(HARSN Rd) built?
It was built in 1977, making it 48 years old in 2025.
What condition is Ramp WBIR74-EBI275 over Taylor CR;C457(HARSN Rd) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does Ramp WBIR74-EBI275 over Taylor CR;C457(HARSN Rd) carry?
About 13,110 vehicles per day (2013 count).
How long is Ramp WBIR74-EBI275 over Taylor CR;C457(HARSN Rd)?
The structure is 449 ft (136.9 m) long with a longest span of 101 ft (30.8 m) and a deck 30 ft wide.
Who owns Ramp WBIR74-EBI275 over Taylor CR;C457(HARSN Rd)?
It is owned by the State Highway Agency.