EB Ir 275 over Taylor CR;C457(HARSN Rd)
GoodHamilton County, Ohio · .2 MI E of Ir 74 · Structure no. 3116352
- Built
- 1977
- 48 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 443 ft
- 5 main spans
- Daily traffic
- 10,974
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
EB Ir 275 over Taylor CR;C457(HARSN Rd) is a steel continuous stringer/multi-beam or girder carrying EB Ir 275 over Taylor CR;C457(HARSN Rd) in Hamilton County, Ohio. It was built in 1977, so it is 48 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10,974 vehicles a day, roughly 15% of them trucks, projected to reach 15,232 by 2035. The structure is 443 ft (135 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was EB Ir 275 over Taylor CR;C457(HARSN Rd) built?
It was built in 1977, making it 48 years old in 2025.
What condition is EB Ir 275 over Taylor CR;C457(HARSN Rd) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does EB Ir 275 over Taylor CR;C457(HARSN Rd) carry?
About 10,974 vehicles per day (2015 count), of which roughly 15% are trucks.
How long is EB Ir 275 over Taylor CR;C457(HARSN Rd)?
The structure is 443 ft (135 m) long with a longest span of 101 ft (30.8 m) and a deck 44 ft wide.
Who owns EB Ir 275 over Taylor CR;C457(HARSN Rd)?
It is owned by the State Highway Agency.