US Bridges

WB Warsaw Ave Ramp over SR264

Good

Hamilton County, Ohio · 500 Ft N of JCT W US50 · Structure no. 3111636

Built
2014
11 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
400 ft
3 main spans
Daily traffic
1,000
2006 count
Owner
State
State Highway Agency

About this bridge

WB Warsaw Ave Ramp over SR264 is a steel continuous stringer/multi-beam or girder carrying WB Warsaw Ave Ramp over SR264 in Hamilton County, Ohio. It was built in 2014, so it is 11 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 2% of them trucks, projected to reach 1,020 by 2026. The structure is 400 ft (121.8 m) long and 37 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWB Warsaw Ave Ramp
CrossesSR264
Location500 Ft N of JCT W US50
RouteState Highway 264
StateOhio
Coordinates39.10255, -84.55428
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating65 US tons
Inventory rating50 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length400 ft (121.8 m)
Longest span153 ft (46.5 m)
Deck width37 ft (11.3 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2006)
Projected traffic1,020 by 2026
Trucks2%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was WB Warsaw Ave Ramp over SR264 built?

It was built in 2014, making it 11 years old in 2025.

What condition is WB Warsaw Ave Ramp over SR264 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does WB Warsaw Ave Ramp over SR264 carry?

About 1,000 vehicles per day (2006 count), of which roughly 2% are trucks.

How long is WB Warsaw Ave Ramp over SR264?

The structure is 400 ft (121.8 m) long with a longest span of 153 ft (46.5 m) and a deck 37 ft wide.

Who owns WB Warsaw Ave Ramp over SR264?

It is owned by the State Highway Agency.