US Bridges

EB Warsaw Rp (C716 over SR264 CR716 (eb Warsaw)

Good

Hamilton County, Ohio · Jct: 50 and 264 · Structure no. 3102858

Built
2014
11 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
882 ft
5 main spans
Daily traffic
5,065
1996 count
Owner
State
State Highway Agency

About this bridge

EB Warsaw Rp (C716 over SR264 CR716 (eb Warsaw) is a steel continuous stringer/multi-beam or girder carrying EB Warsaw Rp (C716 over SR264 CR716 (eb Warsaw) in Hamilton County, Ohio. It was built in 2014, so it is 11 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,065 vehicles a day, roughly 4% of them trucks, projected to reach 6,534 by 2016. The structure is 882 ft (268.8 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEB Warsaw Rp (C716
CrossesSR264 CR716 (eb Warsaw)
LocationJct: 50 and 264
RouteU.S. Route 50
StateOhio
Coordinates39.10219, -84.5544
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating63.2 US tons
Inventory rating48.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20 + Mod
Structure length882 ft (268.8 m)
Longest span192 ft (58.5 m)
Deck width33 ft (10.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,065 (1996)
Projected traffic6,534 by 2016
Trucks4%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was EB Warsaw Rp (C716 over SR264 CR716 (eb Warsaw) built?

It was built in 2014, making it 11 years old in 2025.

What condition is EB Warsaw Rp (C716 over SR264 CR716 (eb Warsaw) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does EB Warsaw Rp (C716 over SR264 CR716 (eb Warsaw) carry?

About 5,065 vehicles per day (1996 count), of which roughly 4% are trucks.

How long is EB Warsaw Rp (C716 over SR264 CR716 (eb Warsaw)?

The structure is 882 ft (268.8 m) long with a longest span of 192 ft (58.5 m) and a deck 33 ft wide.

Who owns EB Warsaw Rp (C716 over SR264 CR716 (eb Warsaw)?

It is owned by the State Highway Agency.