CR718 EB Elberon over CR718 EB Elbe Rp O/US50
GoodHamilton County, Ohio · 0.12 MI E of SR264 JCT · Structure no. 3102793
- Built
- 2012
- 13 years old
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 705 ft
- 4 main spans
- Daily traffic
- 19,770
- 2009 count
- Owner
- State
- State Highway Agency
About this bridge
CR718 EB Elberon over CR718 EB Elbe Rp O/US50 is a steel stringer/multi-beam or girder carrying CR718 EB Elberon over CR718 EB Elbe Rp O/US50 in Hamilton County, Ohio. It was built in 2012, so it is 13 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 19,770 vehicles a day, roughly 14% of them trucks, projected to reach 27,441 by 2029. The structure is 705 ft (215 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR718 EB Elberon over CR718 EB Elbe Rp O/US50 built?
It was built in 2012, making it 13 years old in 2025.
What condition is CR718 EB Elberon over CR718 EB Elbe Rp O/US50 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does CR718 EB Elberon over CR718 EB Elbe Rp O/US50 carry?
About 19,770 vehicles per day (2009 count), of which roughly 14% are trucks.
How long is CR718 EB Elberon over CR718 EB Elbe Rp O/US50?
The structure is 705 ft (215 m) long with a longest span of 228 ft (69.5 m) and a deck 33 ft wide.
Who owns CR718 EB Elberon over CR718 EB Elbe Rp O/US50?
It is owned by the State Highway Agency.