US Bridges

Glendale-Milford over Ir 75 Ramps C D & K

Good

Hamilton County, Ohio · Glendale-Milford RD · Structure no. 3110877

Built
2018
7 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
264 ft
4 main spans
Daily traffic
144,300
2010 count
Owner
State
State Highway Agency

About this bridge

Glendale-Milford over Ir 75 Ramps C D & K is a steel continuous stringer/multi-beam or girder carrying Glendale-Milford over Ir 75 Ramps C D & K in Hamilton County, Ohio. It was built in 2018, so it is 7 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 144,300 vehicles a day, roughly 19% of them trucks, projected to reach 31,980 by 2030. The structure is 264 ft (80.4 m) long and 102 ft wide. If it were closed, the detour would be 13 mi (21 km).

CarriesGlendale-Milford
CrossesIr 75 Ramps C D & K
LocationGlendale-Milford RD
RouteCity Street 8646
StateOhio
Coordinates39.25414, -84.44354
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating74 US tons
Inventory rating57.1 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length264 ft (80.4 m)
Longest span78 ft (23.7 m)
Deck width102 ft (31.2 m)
Roadway width92 ft (27.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic144,300 (2010)
Projected traffic31,980 by 2030
Trucks19%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed13 mi (21 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Glendale-Milford over Ir 75 Ramps C D & K built?

It was built in 2018, making it 7 years old in 2025.

What condition is Glendale-Milford over Ir 75 Ramps C D & K in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Glendale-Milford over Ir 75 Ramps C D & K carry?

About 144,300 vehicles per day (2010 count), of which roughly 19% are trucks.

How long is Glendale-Milford over Ir 75 Ramps C D & K?

The structure is 264 ft (80.4 m) long with a longest span of 78 ft (23.7 m) and a deck 102 ft wide.

Who owns Glendale-Milford over Ir 75 Ramps C D & K?

It is owned by the State Highway Agency.