US Bridges

Ramp to Ge Parkway over Ramp W/HAM-75-1010 Proj.

Good

Hamilton County, Ohio · .8 MI S of SR 126 · Structure no. 3110842

Built
2020
5 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
316 ft
3 main spans
Daily traffic
5,509
2019 count
Owner
State
State Highway Agency

About this bridge

Ramp to Ge Parkway over Ramp W/HAM-75-1010 Proj. is a prestressed concrete continuous stringer/multi-beam or girder carrying Ramp to Ge Parkway over Ramp W/HAM-75-1010 Proj. in Hamilton County, Ohio. It was built in 2020, so it is 5 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,509 vehicles a day, roughly 9% of them trucks, projected to reach 944,000 by 2039. The structure is 316 ft (96.3 m) long and 53 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesRamp to Ge Parkway
CrossesRamp W/HAM-75-1010 Proj.
Location.8 MI S of SR 126
RouteInterstate 75
StateOhio
Coordinates39.24239, -84.4501
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.3 US tons
Inventory rating39.2 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length316 ft (96.3 m)
Longest span110 ft (33.6 m)
Deck width53 ft (16.2 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,509 (2019)
Projected traffic944,000 by 2039
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp to Ge Parkway over Ramp W/HAM-75-1010 Proj. built?

It was built in 2020, making it 5 years old in 2025.

What condition is Ramp to Ge Parkway over Ramp W/HAM-75-1010 Proj. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Ramp to Ge Parkway over Ramp W/HAM-75-1010 Proj. carry?

About 5,509 vehicles per day (2019 count), of which roughly 9% are trucks.

How long is Ramp to Ge Parkway over Ramp W/HAM-75-1010 Proj.?

The structure is 316 ft (96.3 m) long with a longest span of 110 ft (33.6 m) and a deck 53 ft wide.

Who owns Ramp to Ge Parkway over Ramp W/HAM-75-1010 Proj.?

It is owned by the State Highway Agency.