US Bridges

RTE 287 over 95IX 95IX

Good

Westchester County, New York · JCT I287 & I95 · Structure no. 000000005520030

Built
2020
5 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
547 ft
3 main spans
Daily traffic
50,578
2016 count
Owner
State
State Highway Agency

About this bridge

RTE 287 over 95IX 95IX is a steel stringer/multi-beam or girder carrying RTE 287 over 95IX 95IX in Westchester County, New York. It was built in 2020, so it is 5 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50,578 vehicles a day, roughly 15% of them trucks, projected to reach 85,648 by 2041. The structure is 547 ft (166.7 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRTE 287
Crosses95IX 95IX
LocationJCT I287 & I95
RouteInterstate 287
Coordinates40.98741, -73.67043
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.9 US tons
Inventory rating38 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length547 ft (166.7 m)
Longest span185 ft (56.4 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50,578 (2016)
Projected traffic85,648 by 2041
Trucks15%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$15.7 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was RTE 287 over 95IX 95IX built?

It was built in 2020, making it 5 years old in 2025.

What condition is RTE 287 over 95IX 95IX in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does RTE 287 over 95IX 95IX carry?

About 50,578 vehicles per day (2016 count), of which roughly 15% are trucks.

How long is RTE 287 over 95IX 95IX?

The structure is 547 ft (166.7 m) long with a longest span of 185 ft (56.4 m) and a deck 43 ft wide.

Who owns RTE 287 over 95IX 95IX?

It is owned by the State Highway Agency and maintained by the State Toll Authority.