US Bridges

RTE I95 over Midland Avenue

Good

Westchester County, New York · .1 MI W JCT Rts 287 & I95 · Structure no. 000000005514809

Built
2000
25 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
217 ft
1 main span
Daily traffic
66,275
2018 count
Owner
Toll Authority
State Toll Authority

About this bridge

RTE I95 over Midland Avenue is a steel stringer/multi-beam or girder carrying RTE I95 over Midland Avenue in Westchester County, New York. It was built in 2000, so it is 25 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 66,275 vehicles a day, roughly 14% of them trucks, projected to reach 112,230 by 2041. The structure is 217 ft (66.1 m) long and 117 ft wide. If it were closed, the detour would be 5.6 mi (9 km).

CarriesRTE I95
CrossesMidland Avenue
Location.1 MI W JCT Rts 287 & I95
RouteInterstate 95
Coordinates40.98741, -73.67263
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating91.1 US tons
Inventory rating54 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length217 ft (66.1 m)
Longest span212 ft (64.6 m)
Deck width117 ft (35.7 m)
Roadway width112 ft (34 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic66,275 (2018)
Projected traffic112,230 by 2041
Trucks14%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed5.6 mi (9 km)
TollOn an Interstate toll segment under Secretarial agreement
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$18.5 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was RTE I95 over Midland Avenue built?

It was built in 2000, making it 25 years old in 2025.

What condition is RTE I95 over Midland Avenue in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does RTE I95 over Midland Avenue carry?

About 66,275 vehicles per day (2018 count), of which roughly 14% are trucks.

How long is RTE I95 over Midland Avenue?

The structure is 217 ft (66.1 m) long with a longest span of 212 ft (64.6 m) and a deck 117 ft wide.

Who owns RTE I95 over Midland Avenue?

It is owned by the State Toll Authority.