Midland Avenue over 907GX RTE 907G
FairWestchester County, New York · .5 MI N JCT Brp & Ccp · Structure no. 000000003348950
- Built
- 1950
- 75 years old, rebuilt 1998
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 143 ft
- 2 main spans
- Daily traffic
- 8,381
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Midland Avenue over 907GX RTE 907G is a steel stringer/multi-beam or girder carrying Midland Avenue over 907GX RTE 907G in Westchester County, New York. It was built in 1950 and reconstructed in 1998, so it is 75 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,381 vehicles a day, roughly 2% of them trucks, projected to reach 10,181 by 2041. The structure is 143 ft (43.6 m) long and 57 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Midland Avenue over 907GX RTE 907G built?
It was built in 1950, making it 75 years old in 2025. It was reconstructed in 1998.
What condition is Midland Avenue over 907GX RTE 907G in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Midland Avenue over 907GX RTE 907G carry?
About 8,381 vehicles per day (2018 count), of which roughly 2% are trucks.
How long is Midland Avenue over 907GX RTE 907G?
The structure is 143 ft (43.6 m) long with a longest span of 71 ft (21.6 m) and a deck 57 ft wide.
Who owns Midland Avenue over 907GX RTE 907G?
It is owned by the County Highway Agency.