US Bridges

Palmer Avenue over 907GX RTE 907G

Fair

Westchester County, New York · 0.2 MI N JCT Rts Brp<sbsp · Structure no. 000000003347990

Built
1922
103 years old
Condition
Fair
inspected June 2023
Type
Frame
Concrete
Length
49 ft
1 main span
Daily traffic
9,008
2018 count
Owner
County
County Highway Agency

About this bridge

Palmer Avenue over 907GX RTE 907G is a concrete frame carrying Palmer Avenue over 907GX RTE 907G in Westchester County, New York. It was built in 1922, so it is 103 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 9,008 vehicles a day, roughly 3% of them trucks, projected to reach 10,942 by 2041. The structure is 49 ft (14.9 m) long and 47 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesPalmer Avenue
Crosses907GX RTE 907G
Location0.2 MI N JCT Rts Brp<sbsp
RouteCounty Highway 0
Coordinates40.94124, -73.83907
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment6: Equal to present minimum criteria
Operating rating56 US tons
Inventory rating30 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckNot applicable
Main spans1
Design loadUnknown
Structure length49 ft (14.9 m)
Longest span43 ft (13.1 m)
Deck width47 ft (14.3 m)
Roadway width36 ft (10.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,008 (2018)
Projected traffic10,942 by 2041
Trucks3%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$2.5 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Palmer Avenue over 907GX RTE 907G built?

It was built in 1922, making it 103 years old in 2025.

What condition is Palmer Avenue over 907GX RTE 907G in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does Palmer Avenue over 907GX RTE 907G carry?

About 9,008 vehicles per day (2018 count), of which roughly 3% are trucks.

How long is Palmer Avenue over 907GX RTE 907G?

The structure is 49 ft (14.9 m) long with a longest span of 43 ft (13.1 m) and a deck 47 ft wide.

Who owns Palmer Avenue over 907GX RTE 907G?

It is owned by the County Highway Agency.