US Bridges

RTE 987G over Ramp N to Bmp

Fair

Westchester County, New York · .5 MI N JCT Tsp & US 202 · Structure no. 000000001077702

Built
2003
22 years old
Condition
Fair
inspected October 2023
Type
Frame
Concrete
Length
80 ft
1 main span
Daily traffic
23,474
2021 count
Owner
State
State Highway Agency

About this bridge

RTE 987G over Ramp N to Bmp is a concrete frame carrying RTE 987G over Ramp N to Bmp in Westchester County, New York. It was built in 2003, so it is 22 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 23,474 vehicles a day, projected to reach 33,114 by 2041. The structure is 80 ft (24.4 m) long and 53 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesRTE 987G
CrossesRamp N to Bmp
Location.5 MI N JCT Tsp & US 202
Coordinates41.29888, -73.82281
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating90.9 US tons
Inventory rating54.5 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 25 or greater
Structure length80 ft (24.4 m)
Longest span73 ft (22.4 m)
Deck width53 ft (16.3 m)
Roadway width49 ft (14.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic23,474 (2021)
Projected traffic33,114 by 2041
Trucks0%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$4.8 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was RTE 987G over Ramp N to Bmp built?

It was built in 2003, making it 22 years old in 2025.

What condition is RTE 987G over Ramp N to Bmp in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does RTE 987G over Ramp N to Bmp carry?

About 23,474 vehicles per day (2021 count).

How long is RTE 987G over Ramp N to Bmp?

The structure is 80 ft (24.4 m) long with a longest span of 73 ft (22.4 m) and a deck 53 ft wide.

Who owns RTE 987G over Ramp N to Bmp?

It is owned by the State Highway Agency.