US Bridges

RTE 907W over 984J984J87011000 RTE 98

Poor

Westchester County, New York · 0.4 MI N JCT I287+HRP · Structure no. 000000001052850

Built
1969
56 years old, rebuilt 2001
Condition
Poor
inspected December 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
343 ft
4 main spans
Daily traffic
53,880
2020 count
Owner
State
State Highway Agency

About this bridge

RTE 907W over 984J984J87011000 RTE 98 is a steel stringer/multi-beam or girder carrying RTE 907W over 984J984J87011000 RTE 98 in Westchester County, New York. It was built in 1969 and reconstructed in 2001, so it is 56 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 53,880 vehicles a day, roughly 1% of them trucks, projected to reach 76,008 by 2041. The structure is 343 ft (104.4 m) long and 45 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRTE 907W
Crosses984J984J87011000 RTE 98
Location0.4 MI N JCT I287+HRP
Coordinates41.01973, -73.7155
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length343 ft (104.4 m)
Longest span95 ft (28.9 m)
Deck width45 ft (13.7 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic53,880 (2020)
Projected traffic76,008 by 2041
Trucks1%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$10.2 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was RTE 907W over 984J984J87011000 RTE 98 built?

It was built in 1969, making it 56 years old in 2025. It was reconstructed in 2001.

What condition is RTE 907W over 984J984J87011000 RTE 98 in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in December 2024.

How much traffic does RTE 907W over 984J984J87011000 RTE 98 carry?

About 53,880 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is RTE 907W over 984J984J87011000 RTE 98?

The structure is 343 ft (104.4 m) long with a longest span of 95 ft (28.9 m) and a deck 45 ft wide.

Who owns RTE 907W over 984J984J87011000 RTE 98?

It is owned by the State Highway Agency.