RTE 678 over Sewer
GoodQueens County, New York · NB Vwe over Nycdep Sewer · Structure no. 000000001079350
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected August 2024
- Type
- Arch - Deck
- Concrete
- Length
- 37 ft
- 1 main span
- Daily traffic
- —
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 678 over Sewer is a concrete arch - deck carrying RTE 678 over Sewer in Queens County, New York. It was built in 2014, so it is 11 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
No traffic count is recorded. The structure is 37 ft (11.3 m) long and 52 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 678 over Sewer built?
It was built in 2014, making it 11 years old in 2025.
What condition is RTE 678 over Sewer in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does RTE 678 over Sewer carry?
No traffic count is recorded for this structure.
How long is RTE 678 over Sewer?
The structure is 37 ft (11.3 m) long with a longest span of 36 ft (11 m) and a deck 52 ft wide.
Who owns RTE 678 over Sewer?
It is owned by the State Highway Agency.