RTE I678 over Relief
FairQueens County, New York · JCT Gcp & I678 · Structure no. 00000000105591A
- Built
- 1963
- 62 years old, rebuilt 1995
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 247 ft
- 4 main spans
- Daily traffic
- 92,583
- 1999 count
- Owner
- State
- State Highway Agency
About this bridge
RTE I678 over Relief is a steel stringer/multi-beam or girder carrying RTE I678 over Relief in Queens County, New York. It was built in 1963 and reconstructed in 1995, so it is 62 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 92,583 vehicles a day, roughly 9% of them trucks, projected to reach 129,616 by 2019. The structure is 247 ft (75.3 m) long and 33 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I678 over Relief built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1995.
What condition is RTE I678 over Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does RTE I678 over Relief carry?
About 92,583 vehicles per day (1999 count), of which roughly 9% are trucks.
How long is RTE I678 over Relief?
The structure is 247 ft (75.3 m) long with a longest span of 62 ft (18.9 m) and a deck 33 ft wide.
Who owns RTE I678 over Relief?
It is owned by the State Highway Agency.