RTE 31 over Subway Tunnel
PoorMonroe County, New York · In Rochester · Structure no. 000000002256080
- Built
- 1974
- 51 years old
- Condition
- Poor
- inspected December 2024
- Type
- Slab
- Concrete Continuous
- Length
- 205 ft
- 4 main spans
- Daily traffic
- 6,968
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
RTE 31 over Subway Tunnel is a concrete continuous slab carrying RTE 31 over Subway Tunnel in Monroe County, New York. It was built in 1974, so it is 51 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 6,968 vehicles a day, roughly 1% of them trucks, projected to reach 8,464 by 2041. The structure is 205 ft (62.5 m) long and 65 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 31 over Subway Tunnel built?
It was built in 1974, making it 51 years old in 2025.
What condition is RTE 31 over Subway Tunnel in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in December 2024.
How much traffic does RTE 31 over Subway Tunnel carry?
About 6,968 vehicles per day (2019 count), of which roughly 1% are trucks.
How long is RTE 31 over Subway Tunnel?
The structure is 205 ft (62.5 m) long with a longest span of 80 ft (24.3 m) and a deck 65 ft wide.
Who owns RTE 31 over Subway Tunnel?
It is owned by the City or Municipal Highway Agency.