US Bridges

RTE 390 over Trolley Boulevard

Good

Monroe County, New York · 2.5MI S JCT Rol SB + 104 · Structure no. 000000001062540

Built
2018
7 years old
Condition
Good
inspected August 2024
Type
Frame
Concrete
Length
54 ft
1 main span
Daily traffic
73,338
2020 count
Owner
State
State Highway Agency

About this bridge

RTE 390 over Trolley Boulevard is a concrete frame carrying RTE 390 over Trolley Boulevard in Monroe County, New York. It was built in 2018, so it is 7 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 73,338 vehicles a day, roughly 5% of them trucks, projected to reach 76,498 by 2041. The structure is 54 ft (16.5 m) long and 178 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesRTE 390
CrossesTrolley Boulevard
Location2.5MI S JCT Rol SB + 104
RouteState Highway 390
Coordinates43.17164, -77.68321
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating92 US tons
Inventory rating45 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length54 ft (16.5 m)
Longest span50 ft (15.2 m)
Deck width178 ft (54.4 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deck107 ft (32.7 m)

Traffic and service

Average daily traffic73,338 (2020)
Projected traffic76,498 by 2041
Trucks5%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$4.6 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was RTE 390 over Trolley Boulevard built?

It was built in 2018, making it 7 years old in 2025.

What condition is RTE 390 over Trolley Boulevard in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does RTE 390 over Trolley Boulevard carry?

About 73,338 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is RTE 390 over Trolley Boulevard?

The structure is 54 ft (16.5 m) long with a longest span of 50 ft (15.2 m) and a deck 178 ft wide.

Who owns RTE 390 over Trolley Boulevard?

It is owned by the State Highway Agency.