Southern Blvd over RTE 1 1 Fordham RD
FairBronx County, New York · 0.4 MI W of US 1 & Brpc · Structure no. 000000002242029
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected February 2024
- Type
- Frame
- Concrete Continuous
- Length
- 130 ft
- 2 main spans
- Daily traffic
- 17,128
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Southern Blvd over RTE 1 1 Fordham RD is a concrete continuous frame carrying Southern Blvd over RTE 1 1 Fordham RD in Bronx County, New York. It was built in 1962, so it is 63 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 17,128 vehicles a day, roughly 6% of them trucks, projected to reach 17,208 by 2041. The structure is 130 ft (39.6 m) long and 103 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Southern Blvd over RTE 1 1 Fordham RD built?
It was built in 1962, making it 63 years old in 2025.
What condition is Southern Blvd over RTE 1 1 Fordham RD in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Southern Blvd over RTE 1 1 Fordham RD carry?
About 17,128 vehicles per day (2019 count), of which roughly 6% are trucks.
How long is Southern Blvd over RTE 1 1 Fordham RD?
The structure is 130 ft (39.6 m) long with a longest span of 63 ft (19.2 m) and a deck 103 ft wide.
Who owns Southern Blvd over RTE 1 1 Fordham RD?
It is owned by the City or Municipal Highway Agency.