US Bridges

CC215NRMP to US95N over CC215N US95 Oso Blanca

Good

Clark County, Nevada · Centennial Bowl · Structure no. I3021

Built
2022
3 years old
Condition
Good
inspected October 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
555 ft
4 main spans
Daily traffic
17,600
2021 count
Owner
County
County Highway Agency

About this bridge

CC215NRMP to US95N over CC215N US95 Oso Blanca is a prestressed concrete box beam or girders - single or spread carrying CC215NRMP to US95N over CC215N US95 Oso Blanca in Clark County, Nevada. It was built in 2022, so it is 3 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,600 vehicles a day, roughly 17% of them trucks, projected to reach 19,360 by 2041. The structure is 555 ft (169.2 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCC215NRMP to US95N
CrossesCC215N US95 Oso Blanca
LocationCentennial Bowl
RouteCounty Highway 215
StateNevada
Coordinates36.27717, -115.26491
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating70.5 US tons
Inventory rating43.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length555 ft (169.2 m)
Longest span160 ft (48.8 m)
Deck width27 ft (8.2 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,600 (2021)
Projected traffic19,360 by 2041
Trucks17%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was CC215NRMP to US95N over CC215N US95 Oso Blanca built?

It was built in 2022, making it 3 years old in 2025.

What condition is CC215NRMP to US95N over CC215N US95 Oso Blanca in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does CC215NRMP to US95N over CC215N US95 Oso Blanca carry?

About 17,600 vehicles per day (2021 count), of which roughly 17% are trucks.

How long is CC215NRMP to US95N over CC215N US95 Oso Blanca?

The structure is 555 ft (169.2 m) long with a longest span of 160 ft (48.8 m) and a deck 27 ft wide.

Who owns CC215NRMP to US95N over CC215N US95 Oso Blanca?

It is owned by the County Highway Agency.