US95N Ramp to 215S over CC215 US95 Oso Blanco
GoodClark County, Nevada · Centennial Bowl · Structure no. I3020
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected September 2022
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 2,635 ft
- 13 main spans
- Daily traffic
- 15,765
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
US95N Ramp to 215S over CC215 US95 Oso Blanco is a prestressed concrete box beam or girders - single or spread carrying US95N Ramp to 215S over CC215 US95 Oso Blanco in Clark County, Nevada. It was built in 2020, so it is 5 years old, younger than the Nevada average of 36.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 15,765 vehicles a day, roughly 2% of them trucks, projected to reach 17,342 by 2039. The structure is 2,635 ft (803.1 m) long and 39 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US95N Ramp to 215S over CC215 US95 Oso Blanco built?
It was built in 2020, making it 5 years old in 2025.
What condition is US95N Ramp to 215S over CC215 US95 Oso Blanco in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2022.
How much traffic does US95N Ramp to 215S over CC215 US95 Oso Blanco carry?
About 15,765 vehicles per day (2019 count), of which roughly 2% are trucks.
How long is US95N Ramp to 215S over CC215 US95 Oso Blanco?
The structure is 2,635 ft (803.1 m) long with a longest span of 240 ft (73.2 m) and a deck 39 ft wide.
Who owns US95N Ramp to 215S over CC215 US95 Oso Blanco?
It is owned by the State Highway Agency.