US Bridges

CC215N over US95

Good

Clark County, Nevada · Centennial Bowl · Structure no. H3028

Built
2022
3 years old
Condition
Good
inspected May 2023
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
499 ft
4 main spans
Daily traffic
31,000
2022 count
Owner
State
State Highway Agency

About this bridge

CC215N over US95 is a prestressed concrete box beam or girders - single or spread carrying CC215N over US95 in Clark County, Nevada. It was built in 2022, so it is 3 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 31,000 vehicles a day, roughly 14% of them trucks, projected to reach 34,100 by 2042. The structure is 499 ft (152.2 m) long and 67 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCC215N
CrossesUS95
LocationCentennial Bowl
RouteCounty Highway 215
StateNevada
Coordinates36.27754, -115.26691
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating110.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length499 ft (152.2 m)
Longest span132 ft (40.2 m)
Deck width67 ft (20.4 m)
Roadway width63 ft (19.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic31,000 (2022)
Projected traffic34,100 by 2042
Trucks14%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was CC215N over US95 built?

It was built in 2022, making it 3 years old in 2025.

What condition is CC215N over US95 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does CC215N over US95 carry?

About 31,000 vehicles per day (2022 count), of which roughly 14% are trucks.

How long is CC215N over US95?

The structure is 499 ft (152.2 m) long with a longest span of 132 ft (40.2 m) and a deck 67 ft wide.

Who owns CC215N over US95?

It is owned by the State Highway Agency.