US Bridges

I-15S over W Symphony Park Ave

Good

Clark County, Nevada · Neon · Structure no. H3220S

Built
2017
8 years old
Condition
Good
inspected December 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
108 ft
1 main span
Daily traffic
94,400
2021 count
Owner
State
State Highway Agency

About this bridge

I-15S over W Symphony Park Ave is a prestressed concrete stringer/multi-beam or girder carrying I-15S over W Symphony Park Ave in Clark County, Nevada. It was built in 2017, so it is 8 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 94,400 vehicles a day, roughly 5% of them trucks, projected to reach 141,000 by 2037. The structure is 108 ft (32.9 m) long and 84 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesI-15S
CrossesW Symphony Park Ave
LocationNeon
RouteInterstate 15
StateNevada
Coordinates36.17144, -115.1575
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.3 US tons
Inventory rating42.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length108 ft (32.9 m)
Longest span108 ft (32.9 m)
Deck width84 ft (25.6 m)
Roadway width81 ft (24.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic94,400 (2021)
Projected traffic141,000 by 2037
Trucks5%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-15S over W Symphony Park Ave built?

It was built in 2017, making it 8 years old in 2025.

What condition is I-15S over W Symphony Park Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2022.

How much traffic does I-15S over W Symphony Park Ave carry?

About 94,400 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is I-15S over W Symphony Park Ave?

The structure is 108 ft (32.9 m) long with a longest span of 108 ft (32.9 m) and a deck 84 ft wide.

Who owns I-15S over W Symphony Park Ave?

It is owned by the State Highway Agency.