US Bridges

95S Ramp to I15S over W Symphony Park Ave

Good

Clark County, Nevada · Neon · Structure no. H3220L

Built
2017
8 years old
Condition
Good
inspected December 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
168 ft
1 main span
Daily traffic
18,900
2021 count
Owner
State
State Highway Agency

About this bridge

95S Ramp to I15S over W Symphony Park Ave is a prestressed concrete stringer/multi-beam or girder carrying 95S Ramp to I15S over W Symphony Park Ave in Clark County, Nevada. It was built in 2017, so it is 8 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,900 vehicles a day, roughly 5% of them trucks, projected to reach 141,000 by 2037. The structure is 168 ft (51.2 m) long and 27 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

Carries95S Ramp to I15S
CrossesW Symphony Park Ave
LocationNeon
RouteInterstate 15
StateNevada
Coordinates36.17144, -115.15791
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.3 US tons
Inventory rating52.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length168 ft (51.2 m)
Longest span168 ft (51.2 m)
Deck width27 ft (8.2 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,900 (2021)
Projected traffic141,000 by 2037
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 95S Ramp to I15S over W Symphony Park Ave built?

It was built in 2017, making it 8 years old in 2025.

What condition is 95S Ramp to I15S over W Symphony Park Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2022.

How much traffic does 95S Ramp to I15S over W Symphony Park Ave carry?

About 18,900 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is 95S Ramp to I15S over W Symphony Park Ave?

The structure is 168 ft (51.2 m) long with a longest span of 168 ft (51.2 m) and a deck 27 ft wide.

Who owns 95S Ramp to I15S over W Symphony Park Ave?

It is owned by the State Highway Agency.