US Bridges

Rmp CC215 to 95S over Rmp R2&R3

Good

Clark County, Nevada · NW Las Vegas · Structure no. H2338

Built
2002
23 years old
Condition
Good
inspected December 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
110 ft
1 main span
Daily traffic
1,400
2017 count
Owner
County
County Highway Agency

About this bridge

Rmp CC215 to 95S over Rmp R2&R3 is a prestressed concrete box beam or girders - multiple carrying Rmp CC215 to 95S over Rmp R2&R3 in Clark County, Nevada. It was built in 2002, so it is 23 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,400 vehicles a day, projected to reach 2,895 by 2040. The structure is 110 ft (33.5 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRmp CC215 to 95S
CrossesRmp R2&R3
LocationNW Las Vegas
RouteCounty Highway 215
StateNevada
Coordinates36.27607, -115.26776
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating90.7 US tons
Inventory rating46.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length110 ft (33.5 m)
Longest span110 ft (33.5 m)
Deck width35 ft (10.6 m)
Roadway width32 ft (9.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,400 (2017)
Projected traffic2,895 by 2040
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Rmp CC215 to 95S over Rmp R2&R3 built?

It was built in 2002, making it 23 years old in 2025.

What condition is Rmp CC215 to 95S over Rmp R2&R3 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Rmp CC215 to 95S over Rmp R2&R3 carry?

About 1,400 vehicles per day (2017 count).

How long is Rmp CC215 to 95S over Rmp R2&R3?

The structure is 110 ft (33.5 m) long with a longest span of 110 ft (33.5 m) and a deck 35 ft wide.

Who owns Rmp CC215 to 95S over Rmp R2&R3?

It is owned by the County Highway Agency.