I-25 Nbl over Tijeras Arroyo
GoodBernalillo County, New Mexico · 1.35 M S JCT Rio Bravo · Structure no. 000000000009676
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 303 ft
- 3 main spans
- Daily traffic
- 51,483
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-25 Nbl over Tijeras Arroyo is a prestressed concrete continuous stringer/multi-beam or girder carrying I-25 Nbl over Tijeras Arroyo in Bernalillo County, New Mexico. It was built in 2016, so it is 9 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 51,483 vehicles a day, roughly 14% of them trucks, projected to reach 70,016 by 2043. The structure is 303 ft (92.4 m) long and 64 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-25 Nbl over Tijeras Arroyo built?
It was built in 2016, making it 9 years old in 2025.
What condition is I-25 Nbl over Tijeras Arroyo in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does I-25 Nbl over Tijeras Arroyo carry?
About 51,483 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is I-25 Nbl over Tijeras Arroyo?
The structure is 303 ft (92.4 m) long with a longest span of 98 ft (29.9 m) and a deck 64 ft wide.
Who owns I-25 Nbl over Tijeras Arroyo?
It is owned by the State Highway Agency.