Murry Road over South Diversion Channel
FairBernalillo County, New Mexico · 0.22 MI W of NM-47 · Structure no. 000000000008663
- Built
- 1968
- 57 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 145 ft
- 2 main spans
- Daily traffic
- 328
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Murry Road over South Diversion Channel is a prestressed concrete stringer/multi-beam or girder carrying Murry Road over South Diversion Channel in Bernalillo County, New Mexico. It was built in 1968, so it is 57 years old, older than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 328 vehicles a day, projected to reach 446 by 2043. The structure is 145 ft (44.2 m) long and 33 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Murry Road over South Diversion Channel built?
It was built in 1968, making it 57 years old in 2025.
What condition is Murry Road over South Diversion Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Murry Road over South Diversion Channel carry?
About 328 vehicles per day (2023 count).
How long is Murry Road over South Diversion Channel?
The structure is 145 ft (44.2 m) long with a longest span of 69 ft (21 m) and a deck 33 ft wide.
Who owns Murry Road over South Diversion Channel?
It is owned by the County Highway Agency.