US Bridges

FL-4053 over North Pino Arroyo

Fair

Bernalillo County, New Mexico · 0.44 MI N San Antonio NE · Structure no. 000000000007991

Built
1976
49 years old
Condition
Fair
inspected November 2023
Type
Culvert
Concrete
Length
27 ft
1 main span
Daily traffic
9,278
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

FL-4053 over North Pino Arroyo is a concrete culvert carrying FL-4053 over North Pino Arroyo in Bernalillo County, New Mexico. It was built in 1976, so it is 49 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 9,278 vehicles a day, roughly 5% of them trucks, projected to reach 12,618 by 2043. The structure is 27 ft (8.2 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFL-4053
CrossesNorth Pino Arroyo
Location0.44 MI N San Antonio NE
RouteCity Street 4053
Coordinates35.16621, -106.57759
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length27 ft (8.2 m)
Longest span25 ft (7.6 m)
Deck width48 ft (14.6 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,278 (2023)
Projected traffic12,618 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FL-4053 over North Pino Arroyo built?

It was built in 1976, making it 49 years old in 2025.

What condition is FL-4053 over North Pino Arroyo in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does FL-4053 over North Pino Arroyo carry?

About 9,278 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is FL-4053 over North Pino Arroyo?

The structure is 27 ft (8.2 m) long with a longest span of 25 ft (7.6 m) and a deck 48 ft wide.

Who owns FL-4053 over North Pino Arroyo?

It is owned by the City or Municipal Highway Agency.