I-25 Nbl/Sbl/Frtg over North Pino Arroyo
FairBernalillo County, New Mexico · 0.50 MI S Paseo Del Norte · Structure no. 000000000005752
- Built
- 1955
- 70 years old, rebuilt 1985
- Condition
- Fair
- inspected October 2023
- Type
- Culvert
- Concrete
- Length
- 44 ft
- 4 main spans
- Daily traffic
- 144,871
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-25 Nbl/Sbl/Frtg over North Pino Arroyo is a concrete culvert carrying I-25 Nbl/Sbl/Frtg over North Pino Arroyo in Bernalillo County, New Mexico. It was built in 1955 and reconstructed in 1985, so it is 70 years old, older than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 144,871 vehicles a day, roughly 5% of them trucks, projected to reach 197,024 by 2043. The structure is 44 ft (13.4 m) long. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-25 Nbl/Sbl/Frtg over North Pino Arroyo built?
It was built in 1955, making it 70 years old in 2025. It was reconstructed in 1985.
What condition is I-25 Nbl/Sbl/Frtg over North Pino Arroyo in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does I-25 Nbl/Sbl/Frtg over North Pino Arroyo carry?
About 144,871 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is I-25 Nbl/Sbl/Frtg over North Pino Arroyo?
The structure is 44 ft (13.4 m) long with a longest span of 10 ft (3 m).
Who owns I-25 Nbl/Sbl/Frtg over North Pino Arroyo?
It is owned by the State Highway Agency.