FL-4057 over North Pino Arroyo
FairBernalillo County, New Mexico · 0.77 M S Paseo Del Norte · Structure no. 000000000008282
- Built
- 1976
- 49 years old
- Condition
- Fair
- inspected August 2023
- Type
- Slab
- Concrete
- Length
- 35 ft
- 1 main span
- Daily traffic
- 6,891
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
FL-4057 over North Pino Arroyo is a concrete slab carrying FL-4057 over North Pino Arroyo in Bernalillo County, New Mexico. It was built in 1976, so it is 49 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,891 vehicles a day, roughly 5% of them trucks, projected to reach 9,371 by 2043. The structure is 35 ft (10.7 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FL-4057 over North Pino Arroyo built?
It was built in 1976, making it 49 years old in 2025.
What condition is FL-4057 over North Pino Arroyo in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does FL-4057 over North Pino Arroyo carry?
About 6,891 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is FL-4057 over North Pino Arroyo?
The structure is 35 ft (10.7 m) long with a longest span of 35 ft (10.7 m) and a deck 59 ft wide.
Who owns FL-4057 over North Pino Arroyo?
It is owned by the City or Municipal Highway Agency.