US Bridges

FR-2523 over Paseo Del Norte EB

Good

Bernalillo County, New Mexico · Paseo Del NORTE/I-25 · Structure no. 000000000009650

Built
2014
11 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
96 ft
1 main span
Daily traffic
26,993
2023 count
Owner
State
State Highway Agency

About this bridge

FR-2523 over Paseo Del Norte EB is a prestressed concrete stringer/multi-beam or girder carrying FR-2523 over Paseo Del Norte EB in Bernalillo County, New Mexico. It was built in 2014, so it is 11 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 26,993 vehicles a day, roughly 5% of them trucks, projected to reach 36,710 by 2043. The structure is 96 ft (29.4 m) long and 47 ft wide.

CarriesFR-2523
CrossesPaseo Del Norte EB
LocationPaseo Del NORTE/I-25
RouteCity Street 2523
Coordinates35.1736, -106.58502
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating101.3 US tons
Inventory rating48.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length96 ft (29.4 m)
Longest span96 ft (29.4 m)
Deck width47 ft (14.4 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26,993 (2023)
Projected traffic36,710 by 2043
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FR-2523 over Paseo Del Norte EB built?

It was built in 2014, making it 11 years old in 2025.

What condition is FR-2523 over Paseo Del Norte EB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does FR-2523 over Paseo Del Norte EB carry?

About 26,993 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is FR-2523 over Paseo Del Norte EB?

The structure is 96 ft (29.4 m) long with a longest span of 96 ft (29.4 m) and a deck 47 ft wide.

Who owns FR-2523 over Paseo Del Norte EB?

It is owned by the State Highway Agency.