Njtpk Nso Roadway over Port Reading RR & 94UTRN
FairMiddlesex County, New Jersey · .9 MI N Woodbridge Serv.A · Structure no. MS9381S
- Built
- 1950
- 75 years old, rebuilt 1994
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 141 ft
- 3 main spans
- Daily traffic
- 51,133
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Njtpk Nso Roadway over Port Reading RR & 94UTRN is a steel stringer/multi-beam or girder carrying Njtpk Nso Roadway over Port Reading RR & 94UTRN in Middlesex County, New Jersey. It was built in 1950 and reconstructed in 1994, so it is 75 years old, older than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 51,133 vehicles a day, roughly 27% of them trucks, projected to reach 130,187 by 2043. The structure is 141 ft (43 m) long and 80 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Njtpk Nso Roadway over Port Reading RR & 94UTRN built?
It was built in 1950, making it 75 years old in 2025. It was reconstructed in 1994.
What condition is Njtpk Nso Roadway over Port Reading RR & 94UTRN in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Njtpk Nso Roadway over Port Reading RR & 94UTRN carry?
About 51,133 vehicles per day (2023 count), of which roughly 27% are trucks.
How long is Njtpk Nso Roadway over Port Reading RR & 94UTRN?
The structure is 141 ft (43 m) long with a longest span of 48 ft (14.6 m) and a deck 80 ft wide.
Who owns Njtpk Nso Roadway over Port Reading RR & 94UTRN?
It is owned by the State Toll Authority.