US Bridges

Ramp from Nj 7 EB over Relief Area

Good

Hudson County, New Jersey · 2.4MI Neof US1&9&I-95 JCT · Structure no. 0909155

Built
2022
3 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
508 ft
3 main spans
Daily traffic
7,091
2024 count
Owner
State
State Highway Agency

About this bridge

Ramp from Nj 7 EB over Relief Area is a steel continuous stringer/multi-beam or girder carrying Ramp from Nj 7 EB over Relief Area in Hudson County, New Jersey. It was built in 2022, so it is 3 years old, younger than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,091 vehicles a day, roughly 4% of them trucks, projected to reach 8,652 by 2044. The structure is 508 ft (154.8 m) long and 40 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesRamp from Nj 7 EB
CrossesRelief Area
Location2.4MI Neof US1&9&I-95 JCT
RouteState Highway 7
Coordinates40.7389, -74.07683
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.3 US tons
Inventory rating37.8 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length508 ft (154.8 m)
Longest span185 ft (56.4 m)
Deck width40 ft (12.3 m)
Roadway width31 ft (9.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,091 (2024)
Projected traffic8,652 by 2044
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp from Nj 7 EB over Relief Area built?

It was built in 2022, making it 3 years old in 2025.

What condition is Ramp from Nj 7 EB over Relief Area in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Ramp from Nj 7 EB over Relief Area carry?

About 7,091 vehicles per day (2024 count), of which roughly 4% are trucks.

How long is Ramp from Nj 7 EB over Relief Area?

The structure is 508 ft (154.8 m) long with a longest span of 185 ft (56.4 m) and a deck 40 ft wide.

Who owns Ramp from Nj 7 EB over Relief Area?

It is owned by the State Highway Agency.