US Bridges

Njtpk (I-95) over Georgetown Road

Good

Burlington County, New Jersey · 0.1 MI North Int. 7 · Structure no. M05400N

Built
2012
13 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
110 ft
1 main span
Daily traffic
26,185
2024 count
Owner
Toll Authority
State Toll Authority

About this bridge

Njtpk (I-95) over Georgetown Road is a prestressed concrete stringer/multi-beam or girder carrying Njtpk (I-95) over Georgetown Road in Burlington County, New Jersey. It was built in 2012, so it is 13 years old, younger than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 26,185 vehicles a day, roughly 31% of them trucks, projected to reach 35,286 by 2044. The structure is 110 ft (33.5 m) long and 72 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNjtpk (I-95)
CrossesGeorgetown Road
Location0.1 MI North Int. 7
RouteInterstate 95
Coordinates40.12935, -74.69325
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating82.1 US tons
Inventory rating46.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length110 ft (33.5 m)
Longest span110 ft (33.5 m)
Deck width72 ft (21.8 m)
Roadway width68 ft (20.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26,185 (2024)
Projected traffic35,286 by 2044
Trucks31%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Njtpk (I-95) over Georgetown Road built?

It was built in 2012, making it 13 years old in 2025.

What condition is Njtpk (I-95) over Georgetown Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Njtpk (I-95) over Georgetown Road carry?

About 26,185 vehicles per day (2024 count), of which roughly 31% are trucks.

How long is Njtpk (I-95) over Georgetown Road?

The structure is 110 ft (33.5 m) long with a longest span of 110 ft (33.5 m) and a deck 72 ft wide.

Who owns Njtpk (I-95) over Georgetown Road?

It is owned by the State Toll Authority.