SP Tpk NB Off Ramp over Cocheco River
GoodStrafford County, New Hampshire · NB Off-Ramp over Cocheco · Structure no. 022201570011300
- Built
- 2010
- 15 years old
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 179 ft
- 1 main span
- Daily traffic
- 1,233
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
SP Tpk NB Off Ramp over Cocheco River is a steel stringer/multi-beam or girder carrying SP Tpk NB Off Ramp over Cocheco River in Strafford County, New Hampshire. It was built in 2010, so it is 15 years old, younger than the New Hampshire average of 56.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,233 vehicles a day, roughly 8% of them trucks, projected to reach 1,824 by 2043. The structure is 179 ft (54.5 m) long and 35 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SP Tpk NB Off Ramp over Cocheco River built?
It was built in 2010, making it 15 years old in 2025.
What condition is SP Tpk NB Off Ramp over Cocheco River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does SP Tpk NB Off Ramp over Cocheco River carry?
About 1,233 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is SP Tpk NB Off Ramp over Cocheco River?
The structure is 179 ft (54.5 m) long with a longest span of 179 ft (54.5 m) and a deck 35 ft wide.
Who owns SP Tpk NB Off Ramp over Cocheco River?
It is owned by the State Toll Authority.