NH125 over Cocheco River
FairStrafford County, New Hampshire · .7 MI JCT Rt 16 · Structure no. 022201490011300
- Built
- 1931
- 94 years old, rebuilt 1982
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 53 ft
- 1 main span
- Daily traffic
- 16,489
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
NH125 over Cocheco River is a steel stringer/multi-beam or girder carrying NH125 over Cocheco River in Strafford County, New Hampshire. It was built in 1931 and reconstructed in 1982, so it is 94 years old, older than the New Hampshire average of 56.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16,489 vehicles a day, roughly 5% of them trucks, projected to reach 24,403 by 2043. The structure is 53 ft (16.2 m) long and 35 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NH125 over Cocheco River built?
It was built in 1931, making it 94 years old in 2025. It was reconstructed in 1982.
What condition is NH125 over Cocheco River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does NH125 over Cocheco River carry?
About 16,489 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is NH125 over Cocheco River?
The structure is 53 ft (16.2 m) long with a longest span of 51 ft (15.5 m) and a deck 35 ft wide.
Who owns NH125 over Cocheco River?
It is owned by the City or Municipal Highway Agency.