US Bridges

EB-I80 over I480 NB

Good

Douglas County, Nebraska · Grover ST Intrchg · Structure no. S080 45283R

Built
1990
35 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
159 ft
1 main span
Daily traffic
176,745
2018 count
Owner
State
State Highway Agency

About this bridge

EB-I80 over I480 NB is a steel stringer/multi-beam or girder carrying EB-I80 over I480 NB in Douglas County, Nebraska. It was built in 1990, so it is 35 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 176,745 vehicles a day, roughly 7% of them trucks, projected to reach 212,094 by 2038. The structure is 159 ft (48.5 m) long and 63 ft wide.

CarriesEB-I80
CrossesI480 NB
LocationGrover ST Intrchg
RouteInterstate 80
Coordinates41.2275, -95.9571
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.6 US tons
Inventory rating29.8 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length159 ft (48.5 m)
Longest span156 ft (47.5 m)
Deck width63 ft (19.3 m)
Roadway width61 ft (18.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic176,745 (2018)
Projected traffic212,094 by 2038
Trucks7%
Lanes on structure3
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was EB-I80 over I480 NB built?

It was built in 1990, making it 35 years old in 2025.

What condition is EB-I80 over I480 NB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does EB-I80 over I480 NB carry?

About 176,745 vehicles per day (2018 count), of which roughly 7% are trucks.

How long is EB-I80 over I480 NB?

The structure is 159 ft (48.5 m) long with a longest span of 156 ft (47.5 m) and a deck 63 ft wide.

Who owns EB-I80 over I480 NB?

It is owned by the State Highway Agency.