US30 over Fremont Cutoff Ditch
GoodDodge County, Nebraska · 1.5N 8E North Bend · Structure no. S030 41907R
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 100 ft
- 1 main span
- Daily traffic
- 7,494
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
US30 over Fremont Cutoff Ditch is a prestressed concrete stringer/multi-beam or girder carrying US30 over Fremont Cutoff Ditch in Dodge County, Nebraska. It was built in 2023, so it is 2 years old, younger than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,494 vehicles a day, roughly 8% of them trucks, projected to reach 11,331 by 2038. The structure is 100 ft (30.5 m) long and 43 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US30 over Fremont Cutoff Ditch built?
It was built in 2023, making it 2 years old in 2025.
What condition is US30 over Fremont Cutoff Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does US30 over Fremont Cutoff Ditch carry?
About 7,494 vehicles per day (2018 count), of which roughly 8% are trucks.
How long is US30 over Fremont Cutoff Ditch?
The structure is 100 ft (30.5 m) long with a longest span of 100 ft (30.5 m) and a deck 43 ft wide.
Who owns US30 over Fremont Cutoff Ditch?
It is owned by the State Highway Agency.