US30 over Fremont Cutoff Ditch
GoodDodge County, Nebraska · 1.5N 8E North Bend · Structure no. S030 41907L
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 103 ft
- 1 main span
- Daily traffic
- 8,135
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
US30 over Fremont Cutoff Ditch is a prestressed concrete stringer/multi-beam or girder carrying US30 over Fremont Cutoff Ditch in Dodge County, Nebraska. It was built in 2023, so it is 2 years old, younger than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,135 vehicles a day, roughly 12% of them trucks, projected to reach 12,202 by 2041. The structure is 103 ft (31.3 m) long and 43 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US30 over Fremont Cutoff Ditch built?
It was built in 2023, making it 2 years old in 2025.
What condition is US30 over Fremont Cutoff Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does US30 over Fremont Cutoff Ditch carry?
About 8,135 vehicles per day (2021 count), of which roughly 12% are trucks.
How long is US30 over Fremont Cutoff Ditch?
The structure is 103 ft (31.3 m) long with a longest span of 100 ft (30.5 m) and a deck 43 ft wide.
Who owns US30 over Fremont Cutoff Ditch?
It is owned by the State Highway Agency.