Road T over Fremont Cutoff Ditch
GoodPosted for loadDodge County, Nebraska · Rd. T Bet. 16 & 17 · Structure no. C002704015
- Built
- 1964
- 61 years old, rebuilt 2013
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 90 ft
- 1 main span
- Daily traffic
- 90
- 2003 count
- Owner
- County
- County Highway Agency
About this bridge
Road T over Fremont Cutoff Ditch is a steel stringer/multi-beam or girder carrying Road T over Fremont Cutoff Ditch in Dodge County, Nebraska. It was built in 1964 and reconstructed in 2013, so it is 61 years old, older than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 90 vehicles a day, projected to reach 153 by 2033. The structure is 90 ft (27.4 m) long and 24 ft wide. If it were closed, the detour would be 18.6 mi (30 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Road T over Fremont Cutoff Ditch built?
It was built in 1964, making it 61 years old in 2025. It was reconstructed in 2013.
What condition is Road T over Fremont Cutoff Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does Road T over Fremont Cutoff Ditch carry?
About 90 vehicles per day (2003 count).
How long is Road T over Fremont Cutoff Ditch?
The structure is 90 ft (27.4 m) long with a longest span of 87 ft (26.5 m) and a deck 24 ft wide.
Who owns Road T over Fremont Cutoff Ditch?
It is owned by the County Highway Agency.