US Bridges

SR1535 over I-40

Fair

Haywood County, North Carolina · .4 MI.S.JCT.SR1536 · Structure no. 000000000870235

Built
1961
64 years old
Condition
Fair
inspected April 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
215 ft
4 main spans
Daily traffic
1,000
2016 count
Owner
State
State Highway Agency

About this bridge

SR1535 over I-40 is a steel stringer/multi-beam or girder carrying SR1535 over I-40 in Haywood County, North Carolina. It was built in 1961, so it is 64 years old, older than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,000 vehicles a day, roughly 7% of them trucks, projected to reach 2,000 by 2040. The structure is 215 ft (65.5 m) long and 36 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesSR1535
CrossesI-40
Location.4 MI.S.JCT.SR1536
RouteState Highway 1535
Coordinates35.54567, -82.90383
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating35.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans4
Design loadHS 15
Structure length215 ft (65.5 m)
Longest span53 ft (16.1 m)
Deck width36 ft (11 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2016)
Projected traffic2,000 by 2040
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR1535 over I-40 built?

It was built in 1961, making it 64 years old in 2025.

What condition is SR1535 over I-40 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does SR1535 over I-40 carry?

About 1,000 vehicles per day (2016 count), of which roughly 7% are trucks.

How long is SR1535 over I-40?

The structure is 215 ft (65.5 m) long with a longest span of 53 ft (16.1 m) and a deck 36 ft wide.

Who owns SR1535 over I-40?

It is owned by the State Highway Agency.