US Bridges

Future I-74 over N. S. Railroad

Good

Forsyth County, North Carolina · 0.47 MI W. Jct. NC66 · Structure no. 000000000670734

Built
2024
1 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
319 ft
3 main spans
Daily traffic
8,600
2022 count
Owner
State
State Highway Agency

About this bridge

Future I-74 over N. S. Railroad is a prestressed concrete continuous stringer/multi-beam or girder carrying Future I-74 over N. S. Railroad in Forsyth County, North Carolina. It was built in 2024, so it is 1 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,600 vehicles a day, roughly 12% of them trucks, projected to reach 17,200 by 2040. The structure is 319 ft (97.2 m) long and 75 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

Location

No coordinates are recorded for this structure.

CarriesFuture I-74
CrossesN. S. Railroad
Location0.47 MI W. Jct. NC66
RouteU.S. Route 74
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating57 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length319 ft (97.2 m)
Longest span107 ft (32.6 m)
Deck width75 ft (23 m)
Roadway width72 ft (22 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,600 (2022)
Projected traffic17,200 by 2040
Trucks12%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkSTRAHNET connector

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Future I-74 over N. S. Railroad built?

It was built in 2024, making it 1 years old in 2025.

What condition is Future I-74 over N. S. Railroad in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Future I-74 over N. S. Railroad carry?

About 8,600 vehicles per day (2022 count), of which roughly 12% are trucks.

How long is Future I-74 over N. S. Railroad?

The structure is 319 ft (97.2 m) long with a longest span of 107 ft (32.6 m) and a deck 75 ft wide.

Who owns Future I-74 over N. S. Railroad?

It is owned by the State Highway Agency.