Westbound Byp(cld) over Future I-74
GoodClosed to trafficForsyth County, North Carolina · 0.8 Miles West JCT NC-66 · Structure no. 000000000670736
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 298 ft
- 2 main spans
- Daily traffic
- 25,000
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Westbound Byp(cld) over Future I-74 is a prestressed concrete continuous stringer/multi-beam or girder carrying Westbound Byp(cld) over Future I-74 in Forsyth County, North Carolina. It was built in 2024, so it is 1 years old, younger than the North Carolina average of 38.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: closed to all traffic.
It carries about 25,000 vehicles a day, roughly 12% of them trucks, projected to reach 50,000 by 2040. The structure is 298 ft (90.8 m) long and 51 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Westbound Byp(cld) over Future I-74 built?
It was built in 2024, making it 1 years old in 2025.
What condition is Westbound Byp(cld) over Future I-74 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does Westbound Byp(cld) over Future I-74 carry?
About 25,000 vehicles per day (2022 count), of which roughly 12% are trucks.
How long is Westbound Byp(cld) over Future I-74?
The structure is 298 ft (90.8 m) long with a longest span of 155 ft (47.2 m) and a deck 51 ft wide.
Who owns Westbound Byp(cld) over Future I-74?
It is owned by the State Highway Agency.