US Bridges

IRR - US 212 over Tongue River

Fair

Rosebud County, Montana · 1M W Ashland · Structure no. P00037061+04521

Built
1949
76 years old, rebuilt 1994
Condition
Fair
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
204 ft
3 main spans
Daily traffic
2,126
2023 count
Owner
State
State Highway Agency

About this bridge

IRR - US 212 over Tongue River is a steel continuous stringer/multi-beam or girder carrying IRR - US 212 over Tongue River in Rosebud County, Montana. It was built in 1949 and reconstructed in 1994, so it is 76 years old, older than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,126 vehicles a day, roughly 24% of them trucks, projected to reach 2,243 by 2043. The structure is 204 ft (62.1 m) long and 42 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesIRR - US 212
CrossesTongue River
Location1M W Ashland
RouteU.S. Route 212
StateMontana
Coordinates45.59316, -106.28697
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating25 US tons
Inventory rating20 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length204 ft (62.1 m)
Longest span77 ft (23.5 m)
Deck width42 ft (12.9 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,126 (2023)
Projected traffic2,243 by 2043
Trucks24%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR - US 212 over Tongue River built?

It was built in 1949, making it 76 years old in 2025. It was reconstructed in 1994.

What condition is IRR - US 212 over Tongue River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does IRR - US 212 over Tongue River carry?

About 2,126 vehicles per day (2023 count), of which roughly 24% are trucks.

How long is IRR - US 212 over Tongue River?

The structure is 204 ft (62.1 m) long with a longest span of 77 ft (23.5 m) and a deck 42 ft wide.

Who owns IRR - US 212 over Tongue River?

It is owned by the State Highway Agency.