US Bridges

IRR BIA RTE 4 over Tongue River

Fair

Rosebud County, Montana · At Birney Village · Structure no. 00000000000C703

Built
1970
55 years old
Condition
Fair
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
200 ft
3 main spans
Daily traffic
800
2024 count
Owner
Federal
Bureau of Indian Affairs

About this bridge

IRR BIA RTE 4 over Tongue River is a prestressed concrete stringer/multi-beam or girder carrying IRR BIA RTE 4 over Tongue River in Rosebud County, Montana. It was built in 1970, so it is 55 years old, older than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 800 vehicles a day, roughly 10% of them trucks, projected to reach 936 by 2044. The structure is 200 ft (61.1 m) long and 34 ft wide. If it were closed, the detour would be 60.3 mi (97 km).

CarriesIRR BIA RTE 4
CrossesTongue River
LocationAt Birney Village
RouteFederal Lands Road 4
StateMontana
Coordinates45.41191, -106.45764
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating35.9 US tons
Inventory rating27 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length200 ft (61.1 m)
Longest span67 ft (20.4 m)
Deck width34 ft (10.5 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic800 (2024)
Projected traffic936 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed60.3 mi (97 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Indian Affairs
Maintained byBureau of Indian Affairs
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR BIA RTE 4 over Tongue River built?

It was built in 1970, making it 55 years old in 2025.

What condition is IRR BIA RTE 4 over Tongue River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does IRR BIA RTE 4 over Tongue River carry?

About 800 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is IRR BIA RTE 4 over Tongue River?

The structure is 200 ft (61.1 m) long with a longest span of 67 ft (20.4 m) and a deck 34 ft wide.

Who owns IRR BIA RTE 4 over Tongue River?

It is owned by the Bureau of Indian Affairs.