US Bridges

I 90 over Sep Elizabeth LN

Good

Mineral County, Montana · 9.9M W Alberton · Structure no. I00090065+04971

Built
1981
44 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
448 ft
4 main spans
Daily traffic
4,088
2023 count
Owner
State
State Highway Agency

About this bridge

I 90 over Sep Elizabeth LN is a prestressed concrete stringer/multi-beam or girder carrying I 90 over Sep Elizabeth LN in Mineral County, Montana. It was built in 1981, so it is 44 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,088 vehicles a day, roughly 23% of them trucks, projected to reach 4,292 by 2043. The structure is 448 ft (136.5 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI 90
CrossesSep Elizabeth LN
Location9.9M W Alberton
RouteInterstate 90
StateMontana
Coordinates47.01748, -114.67412
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56 US tons
Inventory rating28 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length448 ft (136.5 m)
Longest span133 ft (40.5 m)
Deck width44 ft (13.5 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,088 (2023)
Projected traffic4,292 by 2043
Trucks23%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 90 over Sep Elizabeth LN built?

It was built in 1981, making it 44 years old in 2025.

What condition is I 90 over Sep Elizabeth LN in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does I 90 over Sep Elizabeth LN carry?

About 4,088 vehicles per day (2023 count), of which roughly 23% are trucks.

How long is I 90 over Sep Elizabeth LN?

The structure is 448 ft (136.5 m) long with a longest span of 133 ft (40.5 m) and a deck 44 ft wide.

Who owns I 90 over Sep Elizabeth LN?

It is owned by the State Highway Agency.