Canyon Mill RD over Pablo Feeder Canal 008
GoodLake County, Montana · 2M NW Ronan · Structure no. L24623002+03001
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 51 ft
- 1 main span
- Daily traffic
- 100
- 2025 count
- Owner
- County
- County Highway Agency
About this bridge
Canyon Mill RD over Pablo Feeder Canal 008 is a steel stringer/multi-beam or girder carrying Canyon Mill RD over Pablo Feeder Canal 008 in Lake County, Montana. It was built in 2014, so it is 11 years old, younger than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: open, posting recommended but not legally implemented.
It carries about 100 vehicles a day, roughly 3% of them trucks, projected to reach 100 by 2040. The structure is 51 ft (15.4 m) long and 21 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Canyon Mill RD over Pablo Feeder Canal 008 built?
It was built in 2014, making it 11 years old in 2025.
What condition is Canyon Mill RD over Pablo Feeder Canal 008 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does Canyon Mill RD over Pablo Feeder Canal 008 carry?
About 100 vehicles per day (2025 count), of which roughly 3% are trucks.
How long is Canyon Mill RD over Pablo Feeder Canal 008?
The structure is 51 ft (15.4 m) long with a longest span of 46 ft (14 m) and a deck 21 ft wide.
Who owns Canyon Mill RD over Pablo Feeder Canal 008?
It is owned by the County Highway Agency.