US Bridges

Emory RD over Pablo Feeder Canal 025

Fair

Lake County, Montana · 4M NE Ronan · Structure no. 000000000003329

Built
2018
7 years old
Condition
Fair
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
40 ft
1 main span
Daily traffic
100
2025 count
Owner
County
County Highway Agency

About this bridge

Emory RD over Pablo Feeder Canal 025 is a steel stringer/multi-beam or girder carrying Emory RD over Pablo Feeder Canal 025 in Lake County, Montana. It was built in 2018, so it is 7 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 3% of them trucks, projected to reach 100 by 2040. The structure is 40 ft (12.3 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesEmory RD
CrossesPablo Feeder Canal 025
Location4M NE Ronan
RouteCounty Highway 24428
StateMontana
Coordinates47.58779, -114.05543
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating34 US tons

Structure

MaterialSteel
DeckCorrugated steel
Main spans1
Design loadUnknown
Structure length40 ft (12.3 m)
Longest span38 ft (11.6 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2025)
Projected traffic100 by 2040
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Emory RD over Pablo Feeder Canal 025 built?

It was built in 2018, making it 7 years old in 2025.

What condition is Emory RD over Pablo Feeder Canal 025 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does Emory RD over Pablo Feeder Canal 025 carry?

About 100 vehicles per day (2025 count), of which roughly 3% are trucks.

How long is Emory RD over Pablo Feeder Canal 025?

The structure is 40 ft (12.3 m) long with a longest span of 38 ft (11.6 m) and a deck 24 ft wide.

Who owns Emory RD over Pablo Feeder Canal 025?

It is owned by the County Highway Agency.