Foothill Road over Mission Res Inlet 043
GoodLake County, Montana · 6 M SE ST Ignatius · Structure no. 000000202303281
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 40 ft
- 1 main span
- Daily traffic
- 100
- 2025 count
- Owner
- County
- County Highway Agency
About this bridge
Foothill Road over Mission Res Inlet 043 is a steel stringer/multi-beam or girder carrying Foothill Road over Mission Res Inlet 043 in Lake County, Montana. It was built in 2023, so it is 2 years old, younger than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 100 vehicles a day, roughly 3% of them trucks, projected to reach 100 by 2040. The structure is 40 ft (12.2 m) long and 21 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Foothill Road over Mission Res Inlet 043 built?
It was built in 2023, making it 2 years old in 2025.
What condition is Foothill Road over Mission Res Inlet 043 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does Foothill Road over Mission Res Inlet 043 carry?
About 100 vehicles per day (2025 count), of which roughly 3% are trucks.
How long is Foothill Road over Mission Res Inlet 043?
The structure is 40 ft (12.2 m) long with a longest span of 38 ft (11.5 m) and a deck 21 ft wide.
Who owns Foothill Road over Mission Res Inlet 043?
It is owned by the County Highway Agency.